Evidence and quality
NSR-10 and digital traceability: which construction records should you keep?
Organize drawings, tests and decisions for Colombian projects. Separate technical-supervision requirements from digital recordkeeping practices.
In this article
A construction record should connect applicable drawings and specifications, performed controls, results and responsible professional decisions. Start by identifying the supervision regime applicable to the Colombian project, then distinguish required documents from internal practices for organizing them.
A folder of photographs may show activity without establishing which element was reviewed, against which drawing or who accepted the correction. Digital traceability preserves those relationships.
Establish the applicable supervision regime
NSR-10 is Colombia’s earthquake-resistant construction regulation. Title I hosted by a public authority provides the original text. Read it together with applicable amendments, particularly Decree 945 of 2017 and its technical annex, published by the housing ministry.
That annex changes the scope of independent technical supervision and documentation provisions. Applicability depends on the license, intervention and governing framework. This guide does not determine it using one isolated floor-area threshold.
Amended I.1.2.3 addresses minimum quality controls and testing for buildings exempt from independent technical supervision. Exemption from that supervision does not remove every quality-control duty.
Define professional responsibilities before organizing the archive. An administrative coordinator can collect documents without becoming an independent technical supervisor or replacing professional decisions.
Connect the documentary groups
I.2.2.1 requires written records of the supervisor’s work. Read its provisions alongside the amendments to specific items in Decree 945. This table is an operational organizing tool, not the complete regulation.
| Document group | Responsible producer or reviewer, depending on project | When to add it | Reference and context |
|---|---|---|---|
| Specifications and amendments | Designers and responsible project professionals | Before work and when revisions occur | I.2.2.1(a); identify applicable revision |
| Quality-control program | Builder and independent technical supervisor | Before the controls | I.2.2.1(b), amended in 2017 |
| Photographic records | Recording team; review according to responsibilities | During work and before concealment | I.2.2.1(c); link element and date |
| Tests and interpretation | Laboratory and responsible professional | When results arrive and are evaluated | I.2.2.1(d) and I.2.4.5 |
| Correspondence and assessments | Supervisor, builder and designers | At each query or decision | I.2.2.1(e) and (f) |
| Final drawings and technical occupancy certificate, where applicable | Builder and supervisor within their roles | At closeout and before the relevant action | I.2.2.2 and I.2.2.1(h), amended in 2017 |
Do not label an item “not applicable” merely because no file exists. Record who established non-applicability and why. Likewise, “received” differs from “reviewed and accepted.”
Correct an outdated retention reference
Original I.2.2.2 in the 2010 text referred to retaining records for at least five years. The 2017 annex replaced that section with provisions on signing final drawings and removed I.2.2.2.1. See the annex page numbered 35/44.
Consequently, this guide does not present five years as a general current retention period based solely on the original wording. Set retention by checking the legal, contractual and documentary obligations governing the particular file. A software-provider change must not interrupt required custody.
A traceable observation: worked sequence
Simulated recordkeeping example, not a design or technical-acceptance instruction.
- Record an observation against element E-03, with an overview and a detail photo.
- Reference the drawing and revision used without later overwriting that reference.
- Have the qualified professional record the required check and response owner.
- Preserve the response, supporting document and authorized intervention, if any.
- Record the responsible person’s verification, decision, date and supporting references.
A later photo that “looks fine” cannot establish material strength or approval of a modification. The file must expose the evidence behind the decision.
Make digital records usable outside the platform
As operational practices, define stable identifiers, authors, capture dates, versions, permissions and correction history. Distinguish an event’s reported date from the file-upload date. Do not imply verified location or timing without evidence.
Test export as well: retrieve original files, an index, relationships and decisions. A link that only works while a particular person retains an account is not a sufficient archive strategy.
See construction photo documentation for capture context and construction progress reporting for communicating status. Neither a photo collection nor a customer report replaces the technical file.
How Obrity fits
Obrity organizes project tasks, observations, evidence and documents. That structure can support retrieval and follow-up; compliance also depends on the work and records of responsible professionals.
To review how findings, documents and decisions connect in your operation, request an Obrity demo.
Key takeaways
- Required records depend on the project’s applicable supervision regime and professional responsibilities.
- Traceability connects original evidence, context, review and the responsible person’s decision.
- Decree 945 of 2017 amended Title I; the original 2010 text is not a consolidated regulation.
Frequently asked questions
Does NSR-10 require a particular digital platform?
No. The cited provisions concern supervision records and controls, not a mandatory software brand.
How long must supervision records be retained?
It depends on the applicable framework. Decree 945 of 2017 replaced the original I.2.2.2; its former five-year wording should not be treated as a general current rule without checking the relevant obligations.
Can photos replace tests or technical review?
No. Photographs support documentation but do not replace required tests, professional assessments or responsible decisions.