  1. What Article 34 of Colombia’s Labor Code says (amended by Law 2466 of 2025)
  2. The 3 checkpoints for subcontractor control
  3. 6-point documentation checklist per crew in Colombia
  4. How we solve it in Obrity
  5. Regulatory sources
  6. Key takeaways

Many project managers and remodeling firms in Colombia assume they are shielded because they signed an “all-in civil works contract” with a trade contractor. Legal and operational reality on the ground is different: if a subcontractor’s helper suffers an accident without occupational risk coverage (ARL) or finishes the job with unpaid benefits, the claim usually lands on the builder’s desk.

Editorial note: this article is an operational site-control guide, not legal advice; always review your contracts and insurance policies with qualified labor counsel.

What Article 34 of Colombia’s Labor Code says (amended by Law 2466 of 2025)

Article 34 of the Substantive Labor Code (CST), as amended by Law 2466 of 2025, defines independent contractors and establishes the joint liability rule:

  • The beneficiary of the work or owner of the project—unless the work is foreign to the normal activities of their business—is jointly liable with the contractor for the value of wages, benefits and indemnities to which the workers are entitled.
  • For a construction company, remodeler or general contractor, trades such as structure, masonry, MEP installations, tiling, painting and millwork are part of the core business.

That is why real protection isn’t just a contract clause: it is daily and biweekly verification in the field.

The 3 checkpoints for subcontractor control

CheckpointWhat to verifyWhat happens if missing
1. Before site entryActive ARL (Risk Level V for construction), health (EPS), pension, working-at-heights certificate (if applicable) and PPE deliveryWorker does not enter the job site
2. At every progress cutoffPaid PILA social security receipt for the period (not just a draft slip), roster of on-site workers and payroll proofProgress payment is held until resolved
3. At contract closeoutSigned wage and benefit release from crew members, final settlement and closed punch listWarranty retention is not released

6-point documentation checklist per crew in Colombia

Before authorizing a trade crew to start and before approving any progress billing, verify these six items:

  • Signed subcontract or work order with clear scope, unit prices, schedule and required bonds.
  • Updated nominal roster of every individual actually entering the site (ID number and trade).
  • Paid PILA social security receipt for the current month, checking that every worker on site is listed—not just the company owner.
  • Active Risk Level V ARL certificate for construction activities.
  • Valid working-at-heights certificate and occupational medical fitness exam for anyone working above 2.0 meters or in excavations.
  • Safety induction and PPE delivery log under Colombia’s Occupational Health and Safety Management System (Decree 1072 of 2015).

How we solve it in Obrity

When compliance files are requested over WhatsApp, PDFs get buried under progress photos and nobody notices when a new helper walks in without ARL coverage. In Obrity, every document and certificate is tied to the project and subcontractor, with an auditable trail and electronic signature for start certificates, payment cutoffs and closeout releases.

Explore our field solutions or book a demo to see how Obrity keeps your job sites protected.

Regulatory sources

Key takeaways

  • In Colombia, signing a civil or commercial contract with a subcontractor does not eliminate joint labor liability if the work is part of your normal business activity.
  • Article 34 of the Substantive Labor Code (amended by Law 2466 of 2025) makes the hiring company jointly liable for wages, benefits and workplace compensation.
  • Allowing a worker on site without active Level V occupational risk insurance (ARL) or paid social security (PILA) exposes the entire project.
  • The strongest operational defense is conditioning site entry and every progress payment on verified documentation.

Frequently asked questions

What is joint labor liability in Colombian construction under Article 34 of the CST?

It's the legal rule under which the party hiring an independent contractor is jointly liable for the wages, statutory benefits and indemnities owed to the contractor's workers, unless the work is unrelated to the hiring company's normal business activities.

Is an indemnity clause in the subcontractor agreement enough to protect the builder?

No, not in front of the worker. An indemnity clause lets you seek reimbursement from the subcontractor afterward if they are solvent, but before a labor judge the builder or hiring company remains jointly liable.

How often should subcontractor social security be verified on site?

Yes, before any worker's first entry onto the job site, and then monthly and as a mandatory prerequisite before releasing each biweekly or monthly progress payment.

Back to the blog

Obrity

Put this into practice on your next project.

In 20 minutes we'll show you how it looks with your projects: progress, evidence, reports and AI agents.

Security verification

Download resource

For security and to deliver the verified template, enter your name and work email and complete the human check below.

Security Captcha

Verified secure download · Zero spam.